Skip to content
en
Singapore USD
Skip to product information
Description

Jackson Artist FR 105HWT Sinking Minnow Lure WBS

105mm | Sinking

The Jackson Artist FR 105HWT is a heavy-tuned sinking minnow for big water, current, and longer casts.

The 105mm profile gives a proper baitfish size, while the heavier setup helps it stay connected in deeper or faster lanes.

Cast across the current or along the bank, let it sink to the depth you need, then work it with firm twitches and controlled winding.

The lure should flash and kick without being ripped out of the feeding lane too early.

It is strongest in large rivers, deep pools, river mouths, and sea-run trout or bass water.

It is not the best choice for shallow snaggy creeks; use it when distance and depth control matter.

TARGET SPECIES: trout, sea-run trout, char, perch, chub, bass, and predators holding in current, deeper runs, and baitfish lanes.

Jackson Artist FR 105HWT Sinking Minnow Lure WBS (3214)

Regular price $22.10

Shipping calculated at checkout

Jackson Artist FR 105HWT Sinking Minnow Lure WBS

105mm | Sinking

The Jackson Artist FR 105HWT is a heavy-tuned sinking minnow for big water, current, and longer casts.

The 105mm profile gives a proper baitfish size, while the heavier setup helps it stay connected in deeper or faster lanes.

Cast across the current or along the bank, let it sink to the depth you need, then work it with firm twitches and controlled winding.

The lure should flash and kick without being ripped out of the feeding lane too early.

It is strongest in large rivers, deep pools, river mouths, and sea-run trout or bass water.

It is not the best choice for shallow snaggy creeks; use it when distance and depth control matter.

TARGET SPECIES: trout, sea-run trout, char, perch, chub, bass, and predators holding in current, deeper runs, and baitfish lanes.

Jackson Artist FR 105HWT Sinking Minnow Lure WBS (3214)
Drawer Title
Similar Products