Skip to content
en
Singapore USD
Skip to product information
Description

Jackson Artist FR 70 Sinking Minnow Lure WBS

70mm | Sinking

The Jackson Artist FR 70 is a sinking flat-sided minnow for trout, stream, and current work.

The body shape gives quick flash on a twitch, while the sinking setup lets you put the lure into the lane rather than skating over the fish.

Cast across or slightly upstream, let it settle, then retrieve with short twitches and controlled winding.

A good retrieve should make it look like baitfish being pushed by flow and losing balance near rocks or seams.

It is strongest in runs, pools, drains, estuary edges, and rocky current where predators hold behind cover.

It is not a dead-slow bottom lure; keep it working through the lane and stay aware of depth around snags.

TARGET SPECIES: trout, sea-run trout, char, perch, bass, chub, and predators holding in current, pools, and baitfish lanes.

Jackson Artist FR 70 Sinking Minnow Lure WBS (7550)

Regular price $20.10

Shipping calculated at checkout

Jackson Artist FR 70 Sinking Minnow Lure WBS

70mm | Sinking

The Jackson Artist FR 70 is a sinking flat-sided minnow for trout, stream, and current work.

The body shape gives quick flash on a twitch, while the sinking setup lets you put the lure into the lane rather than skating over the fish.

Cast across or slightly upstream, let it settle, then retrieve with short twitches and controlled winding.

A good retrieve should make it look like baitfish being pushed by flow and losing balance near rocks or seams.

It is strongest in runs, pools, drains, estuary edges, and rocky current where predators hold behind cover.

It is not a dead-slow bottom lure; keep it working through the lane and stay aware of depth around snags.

TARGET SPECIES: trout, sea-run trout, char, perch, bass, chub, and predators holding in current, pools, and baitfish lanes.

Jackson Artist FR 70 Sinking Minnow Lure WBS (7550)
Drawer Title
Similar Products